Suiling Township Development Company 200KW Energy Storage Electromagnetic Boiler Project

Suiling Township Development Company 200KW Energy Storage Electromagnetic Boiler Project

2026-07-02Engineering Case

Project Overview

This project is located in the centralized heating area of Suiling County Township Development Company, Heilongjiang Province, primarily providing winter heating and daily hot water services for office buildings and supporting public facilities. The project has an installed capacity of 200KW, using a single energy storage electromagnetic boiler that stores heat during off-peak electricity hours and releases heat as needed during the day, balancing heating stability and operational economy.

Key Parameters

  • Project Location: Suiling County, Heilongjiang Province
  • Installed Capacity: 200KW
  • Equipment Type: Energy Storage Electromagnetic Boiler
  • Application Scenario: Township Centralized Heating
  • Commissioning Time: 2025-2026 Heating Season

Customer Pain Points

Before the renovation, the area had long relied on small coal-fired boilers, with the following prominent contradictions:

  • Large coal price fluctuations and low combustion efficiency kept operating costs persistently high;
  • Significant dust and slag emissions fell short of county environmental requirements;
  • Manual coal addition and inspection required at night, with high maintenance intensity;
  • Heating temperature affected by coal quality and furnace conditions, resulting in unstable comfort.

Solution

Jingyu Thermal Energy customized a 200KW energy storage electromagnetic boiler solution for the township-level centralized heating scenario. The complete system consists of a boiler main unit, insulated water storage tank, circulation pump, PLC intelligent control cabinet, and IoT remote monitoring terminal.

Unit Configuration

  • Core Main Unit: One 200KW high-frequency electromagnetic induction boiler, with thermal efficiency ≥98%;
  • Heat Storage Device: Large-capacity insulated water storage tank, completing full-power heat storage during off-peak hours at night;
  • Circulation System: High-temperature hot water circulation pump set + plate heat exchanger, compatible with terminal radiators and fan coil units;
  • Control Unit: PLC intelligent control cabinet, supporting time-segment programming, manual/automatic switching, and fault self-diagnosis.

Core Technology and Highlights

  • High-frequency Electromagnetic Induction Heating: Complete separation of water and electricity, eliminating leakage and scaling risks from the source;
  • Off-peak Heat Storage Strategy: Full-power heat storage during low-price hours at night, on-demand heat release during peak and flat periods, significantly reducing overall electricity costs;
  • Modular Quick-installation Structure: Small footprint, short installation period, highly friendly to township construction conditions;
  • Anti-corrosion Insulated Shell: Adapted to the extremely cold climate of Northeast China, with heat loss controlled at a low operating range.

Implementation and Schedule

The project has a compact overall cycle from on-site survey, scheme design, equipment production to on-site installation, commissioning, and grid connection. The equipment room adopts a compact layout, with the yellow office building serving as the central control and dispatch center. Key parameters such as water temperature, pressure, and power consumption are connected to the IoT monitoring platform and can be viewed synchronously on the central control room's large screen and mobile devices.

Operating Results

  • Thermal efficiency stable at over 98%, with significantly reduced overall energy consumption compared to traditional coal-fired boilers;
  • Zero emissions, zero combustion noise, significantly improving the environment of the plant and surrounding areas;
  • Relying on the off-peak heat storage strategy, electricity expenses for the entire heating season are significantly reduced compared to before the renovation;
  • Fully automated operation, no need for dedicated personnel on duty, with synchronous reduction in maintenance labor costs.

Customer Value

After the project was implemented, Suiling Township Development Company achieved simultaneous improvements in three aspects: livelihood heating quality, clean energy structure, and operation and maintenance management efficiency, establishing a replicable model project for the county's low-carbon transformation and beautiful rural construction.